Experience Inc. Jobs

Job Information

CBRE Mechanical Engineer - Program Management (Data Center Construction) in Mountain View, California

Mechanical Engineer - Program Management (Data Center Construction)

Job ID

132115

Posted

29-Aug-2023

Service line

GWS Segment

Role type

Full-time

Areas of Interest

Construction, Data Centers, Project Management

Location(s)

Mountain View - California - United States of America, New York City - New York - United States of America, Reston - Virginia - United States of America, Sunnyvale - California - United States of America

About the role

  • The Data Center Mechanical Engineer will be responsible for assisting and augmenting day-to-day capacity of the Mechanical Engineering team working on the client's large hyperscale data center construction program within the Global Data Center - Execution Engineering team! This includes design & localization of new hyperscale data centers and campuses, supporting operations staff with engineering solutions, and streamlining construction issues resolutions, as further detailed below:

What you’ll do

  • Review and assist technical development of mechanical systems (both airside & waterside) for hyperscale data centers including campus planning, general layout/arrangements, CFD & noise modeling, climate data evaluations, hydraulic analyses, pipe sizing, bin hour analyses, etc.

  • Oversee A/E design consultants and provide direction or amplification in accordance with established engineering standards.

  • Peer review consultants’ deliverables including drawing sets, specifications, sequence of operations, calculations, models, etc. and provide comments & resolutions

  • Review and provide recommendations on potential value engineering opportunities

  • Analyze for redundancies, failure modes, and Single Points Of Failure (SPOFs) while working with Reliability, Availability & Maintainability (RAM) modelers to verify conformance.

  • Perform rapid conceptual sketches using CAD or BIM for visualization and spatial/dimensional validations for internal purposes only

  • Experience with waterless cooling solutions (i.e.: air-cooled chillers, dry coolers, airside economizer/IDEC/DX, etc.) preferred

  • Experience with EPA regulations and emissions after-treatment solutions for diesel generators preferred

  • Assist and occasionally lead projects and solutioning of mechanical issues, outages, fleet-wide improvements and other needs arising from existing, operational YAWN campuses as ExE (Execution Engineering) representative in direct support of DCOps partners.

  • Evaluate post-mortem reports, 8D/root cause analyses and presentations and make comments and recommendations.

  • Assist in generating solution/upgrade/improvement options that have a fleet-wide impact to improve reliability and availability of critical operational infrastructure.

  • Assist data analytics of operational trends (historian trend logs) to evaluate equipment health, remaining useful life and predictive failure models.

  • Experience in hydroponics systems, water quality management and corrosion/fouling prevention is helpful

  • Proficiency in fuel oil quality standards is helpful

  • Work with partners in construction, design and change management to compile, prioritize/triage and process construction originated engineering issues (i.e.: Data Center Bounty program) for standard design/product improvements.

  • Occasionally develop engineering bulletins and route through established procedures to ensure wide dissemination of design changes.

  • Support in overall standard design improvement loops/processes between products, design, construction and operations.

  • Visit construction sites or operational sites only if needed

  • Operate client's internal “Buganizer” platform to file new bugs, work orders or close out

  • Build presentations (or ‘presos’) using Google Slides software as the main ‘deliverable’ format to communicate findings, evaluations and options to internal collaborators.

What you’ll need

  • Bachelor's Degree in Mechanical Engineering is required.

  • Minimum of 5 years of demonstrated experience, with at least 2 years of experience in data center construction

  • Familiarity with Google Workspace and its related products (Sheets, Docs, Slides).

  • Experience and knowledge of working with cross-disciplinary teams, including structural, civil, IT/Telecom, security, mechanical, electrical, and architectural.

  • Solid understanding of large-scale, data center mechanical infrastructure, including cooling and fire protection.

  • Familiarity with mission critical infrastructure.

  • Experience coordinating scope with multiple trades (architecture, telecom, electrical, plumbing, mechanical, and structural)

  • Must be able to work independently remotely, but also willing to travel to construction sites with little or no supervision.

  • Experience with data center projects inside and outside of the US is strongly preferred.

Why CBRE?

  • FORTUNE’s Most Admired Real Estate Company in 2023 and 4 of last 5 years!

  • Forbes A top company for diversity and women in 2022

  • Forbes Named one of the best large employers in America

  • U.S. Environmental Protection Agency’s 2022 ENERGY STAR Sustained Excellence Award; 15th consecutive year of “Partner of the Year” recognition

CBRE carefully considers multiple factors to determine compensation, including a candidate’s education, training, and experience. The minimum salary for the Data Center Mechanical Engineer - Construction Program Management position is $150,000 annually and the maximum salary for the Data Center Mechanical Engineer - Construction Program Management position is $175,000 annually. The compensation that is offered to a successful candidate will depend on the candidate’s skills, qualifications, and experience. Successful candidates will also be eligible for a discretionary bonus based on CBRE’s applicable benefit program. This role will provide the following benefits: 401(K), Dental insurance, Health insurance, Life insurance, and Vision insurance.

CBRE is an equal opportunity employer that values diversity. We have a long-standing commitment to providing equal employment opportunity to all qualified applicants regardless of race, color, religion, national origin, sex, sexual orientation, gender identity, pregnancy, age, citizenship, marital status, disability, veteran status, political belief, or any other basis protected by applicable law. We also provide reasonable accommodations, as needed, throughout the job application process. If you have a disability that inhibits your ability to apply for a position through our online application process, you may contact us via email at recruitingaccommodations@cbre.com or via telephone at +1 866 225 3099 (U.S.) and +1 866 388 4346 (Canada).

NOTE: Some, but not all, of our positions may have an additional requirement to comply with COVID-19 health and safety protocols, including COVID-19 vaccination proof and/or rigorous testing. If you have questions about the requirement(s) for this position, please inform your Recruiter.

CBRE, Inc. is an Equal Opportunity and Affirmative Action Employer (Women/Minorities/Persons with Disabilities/US Veterans)

DirectEmployers