Job Information
TAK Communications Data Center Construction Project Manager (Telecom) in Houston, Texas
Data Center Construction Project Manager (Telecom)
Houston, TX (http://maps.google.com/maps?q=Houston+TX+USA) •Construction
Job Type
Full-time
Description
TAK Communications is a leading national telecommunications and broadband service provider that offers full value chain communications services and solutions to its customers across the US, from project management, engineering, and construction to drops, fulfilment and door-to-door sales in over 40 states. TAK Communications prides itself on being a trusted business partner for its customers in the broadband and communications sector, providing solutions that exceed their expectations.
We are seeking a highly skilled Project Manager, Data Center Construction to join our team in Sioux Falls, SD or the Houston, TX area. The Project Manager will lead the design and construction of data center projects, ensuring the successful delivery of high-quality data centers within scope, time, and budget to meet our customer’s needs.
Why TAK?
Full Time
Paid Weekly
Full Benefits Package (Medical, Dental & Vision)
Paid Time Off
401(k) with Company Match!
25K Company Paid Life Insurance
Independent Work & Team Collaboration
Career Development & Advancement Opportunities!
The Role
Leads the design process for data center facilities, ensuring designs align with industry standards, operational needs, and project requirements
Collaborates with design engineers, architects, and IT specialists to create optimal layouts for power, cooling, networking, and security systems, ensuring project scope align with data center operational requirements
Reviews and approves design plans, blueprints, and technical drawings, ensuring designs meet scalability, redundancy, and energy efficiency requirements
Oversees all phases of data center construction from initial design through completion
Manages relationships with contractors, subcontractors, vendors, and other stakeholders to ensure that construction and design specifications are accurately followed
Ensures adherence to safety standards, building codes, and data center operational requirements
Participates in the Request for Quotation (RFQ) process by providing technical input, assisting with cost estimation, and ensuring all relevant elements are accurately represented in bids and proposals
Identifies potential risks, develops mitigation strategies, and monitors the project to minimize disruptions
Maintains detailed documentation of the design process, construction progress, compliance reports, and any changes in project scope
Addresses and resolves project issues as they arise, ensuring minimal disruption to project timelines and objectives
Oversees final inspections, ensuring all items are completed prior to project hand-off
Other duties as assigned
Requirements
5+ of years of experience in construction project management, engineering, or architecture, with a strong preference for experience in data center construction
Bachelor’s degree in Architecture, Engineering, Construction Management, or a related field; relevant certifications (e.g., LEED, PMP, OSHA) are a plus
In-depth knowledge of data center design principles and infrastructure, including mechanical, electrical, and HVAC systems
Proficiency with construction management software and project scheduling tools
Strong organizational and multitasking skills, excellent communication and leadership abilities, problem-solving skills, and attention to detail
Ability to manage multiple projects and coordinate complex design and construction activities simultaneously
Strong proficiency in design software (e.g., AutoCAD, Revit) and construction management tools
Excellent organizational, project management, and negotiation skills
Knowledge of safety standards and building codes (e.g., OSHA, NFPA, TIA-942)
Strong analytical and financial acumen
Travel +/- 50% annually
Valid driver’s license
Passing of all pre-employment requirements (MVR, Background Check, Drug Screen)
Equal Employment Opportunity (EEO) Employer
All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, disability, or status as a protected veteran.
Salary Description
$100 - $150K base annually, DOE
TAK Communications
- TAK Communications Jobs